Pakistan seek solutions to lift World Cup gloom

Pakistan’s Sarfaraz Ahmed and Mohammad Hafeez celebrate victory over England at Trent Bridge on June 3, 2019 (Reuters)
Updated 07 July 2019
Follow

Pakistan seek solutions to lift World Cup gloom

  • Renewed calls for overhaul of system, changes in team set-up and style of play after Pakistan fail to qualify for semis
  • 1992 World Cup winner Wasim Akram says there was no need to panic

LONDON: Every World Cup failure for Pakistan sparks a wave of reviews and sackings and the promise of a fresh approach — until the team wins again and all is forgotten.
The script is expected to be similar after Sarfaraz Ahmed’s team failed to make the semifinals in England and Wales despite a late charge.
Pakistan won four straight matches to finish level on 11 points with New Zealand, but they bowed out of the tournament due to an inferior net run-rate.
There have once again been calls for an overhaul of the system, changes in the team set-up and style of play, but 1992 World Cup winner Wasim Akram said there was no need to panic.
“Pakistan woke up late in the World Cup and when they gained momentum they won four straight games,” the former captain told AFP.
“It is not a bad finish and I don’t think we need to panic.
“There is no quick fix and the people running cricket need time and must keep the example of how England lifted their one-day cricket. I am ready to contribute toward that.”
England’s humiliating first-round exit in 2015 sparked a radical rethink and the host nation started this World Cup as the number one side in the world.
Another World Cup winner, Ramiz Raja, believes Pakistan have the ability to produce “magical” cricket and says their exit is a loss to the tournament.
But he said every defeat was an opportunity to assess things and that ruthless decisions were required.
“I think every defeat gives an opportunity for introspection, so Pakistan need to do four or five things if they want to be a force in world cricket,” he said.
“Pakistan have to correct their system, which can provide them with regular talent and then define and refine that talent.
“Look at Australia — they were losing against every team a year ago but since their system is strong they stood up. We need to take ruthless decisions in a review.”
The positions of head coach Mickey Arthur and captain Sarfaraz — both of whom had contracts until the World Cup — will be looked at as part of the assessment.
Luckily for Pakistan, they have a crop of talented youngsters who can form the nucleus of the team for years to come.
“At 24, we’re the youngest team by a long way in this competition, and that is something that we can be proud of, and I think that augurs well for the future of Pakistan cricket,” said Arthur, who wants to continue in the role of coach.
“We’ve showcased a lot of our young talent, and I think the likes of Shaheen Afridi, Babar Azam, Imam-ul-Haq, Shadab Khan, the list goes on and on. And look, there’s going to be a review now, and we’ll see how that goes.
“Unfortunately it has always been this way for Pakistan — we don’t seem to be able to find that collective consistency. But my message, again, is ‘let’s stay positive’.”
Pakistan has hosted little international cricket since Sri Lanka’s team bus was attacked in 2009 in Lahore.
The situation has forced Pakistan to play at neutral venues in the United Arab Emirates, meaning the game is not so visible to the younger generation who need to be inspired to play the game.
The nation’s cricket board is striving to bring back international cricket to Pakistan in the hope that will provide a further catalyst for a revival in the team’s fortunes.


Pakistan fined, docked 5 points for slow over rate against South Africa

Updated 7 sec ago
Follow

Pakistan fined, docked 5 points for slow over rate against South Africa

  • Pakistan was ruled to be five overs short of target after time allowances were taken into consideration
  • South Africa swept Pakistan 2-0 in the series with a 10-wicket win inside four days in the second Test

DUBAI: The ICC has fined Pakistan players 25 percent of their match fee and also docked the team five World Test Championship points for maintaining a slow over-rate against South Africa in the second Test at Newlands.
South Africa, which will take on Australia in the WTC final at Lord’s in June, swept Pakistan 2-0 in the series with a 10-wicket win inside four days in the second Test.
The ICC said in a statement that match referee Richie Richardson of the West Indies imposed the sanction after “Pakistan was ruled to be five overs short of the target after time allowances were taken into consideration.”
According to the ICC code of conduct, players are fined five percent of their match fee for every over their side fails to bowl in the allotted time. The teams are also penalized one WTC point for each over short.
The ICC also said that Pakistan captain Shan Masood accepted the proposed sanction, so there was no need for a formal hearing.
Pakistan is at No. 8 in the points table just above last-placed West Indies.


Pakistan to hire consultant in few weeks for regulatory framework on satellite-based Internet

Updated 37 min 7 sec ago
Follow

Pakistan to hire consultant in few weeks for regulatory framework on satellite-based Internet

  • Pakistan, a country of more than 240 million, has witnessed up to 40 percent drop in Internet speeds in the last few months
  • The country is in talks with Elon Musk’s Starlink satellite Internet provider, plans to link up with 2Africa submarine cable

ISLAMABAD: Pakistan will be hiring a consultant to finalize regulations regarding satellite-based Internet services in the country, its information technology (IT) ministry said on Monday.
The statement came after State Minister for IT Shaza Fatima Khawaja chaired a meeting in Islamabad to review progress on licensing of Starlink Services, owned by US billionaire Elon Musk, and regulatory frameworks for Low Earth Orbit (LEO) satellites.
Pakistan, a country of over 240 million, has witnessed up to 40 percent drop in Internet speeds in the last few months, according to the Wireless and Internet Service Providers Association of Pakistan (WISPAP).
The drop came as the federal government last year moved to implement a nationwide firewall to block malicious content and protect government networks from cyberattacks, with IT associations saying the slowdowns have resulted in significant losses.
“During the meeting, it was decided that consultant hiring will be completed in a few weeks, for regulations,” the Pakistani IT ministry said.
“The minister emphasized the need for aligning Pakistan’s policies with global standards to unlock satellite technology’s full potential for national growth.”
Pakistan suffered a total of $1.62 billion losses due to Internet outages and social media shutdowns in 2024, according to a report by global Internet monitor Top10VPN.com, surpassing losses in war-torn countries like Sudan and Myanmar.
The report, released on Jan. 2, said Pakistan experienced 9,735 hours of Internet disruptions that affected 82.9 million users, with elections and protests cited as the primary causes.
The IT state minister last month confirmed that Pakistan was in talks with Musk’s Starlink to bring satellite Internet services to the country.
“Discussions [at Monday’s meeting] focused on expediting these processes to ensure a robust regulatory framework for LEO satellites, enhancing connectivity, and driving technological innovation,” the IT ministry added.
Pakistan also plans to enhance its Internet speeds and connectivity by linking up with the 2Africa submarine cable later this year, according to the Pakistan Telecommunications Authority (PTA), which regulates Internet in the South Asian country.
2Africa, one of the world’s largest submarine cable systems, spans 45,000 kilometers and connects 46 locations across Africa, Europe and the Middle East, offering speeds of up to 180 Tbps.


Qaddafi Stadium renovation nears completion ahead of next month’s Champions Trophy in Pakistan

Updated 49 min 32 sec ago
Follow

Qaddafi Stadium renovation nears completion ahead of next month’s Champions Trophy in Pakistan

  • The stadium will feature over 34,000 seats, brand-new scoreboards and state-of-the-art floodlights
  • The ICC Champions Trophy is set to begin on Feb. 19 in Karachi with Pakistan taking on New Zealand

ISLAMABAD: The renovation of Qaddafi Stadium in Pakistan’s eastern Lahore city is close to completion, with all major structural work finished and final touches being applied ahead of the upcoming ICC Champions Trophy, Pakistani state media reported this week.
The Pakistan Cricket Board (PCB) has been renovating stadiums in Lahore and Karachi in preparation for the 2025 Champions Trophy scheduled to take place in February across three venues: Lahore, Karachi, and Rawalpindi. This will be the first ICC tournament held in Pakistan since the 1996 World Cup.
Pakistani fans have long expressed dissatisfaction with the country’s stadiums, particularly the National Bank Stadium in Karachi, citing a lack of basic facilities and a subpar viewing experience for spectators. In May last year, PCB Chairman Mohsin Naqvi directed officials to immediately hire an international consultant to upgrade Qaddafi Stadium in Lahore, National Bank Stadium in Karachi and Rawalpindi Cricket Stadium.
The PCB chairman visited Qaddafi Stadium on Monday to assess the progress of the renovation project and inspected construction of floors of the main building and top tiers of general enclosures, the Associated Press of Pakistan (APP) news agency reported.
“The up-gradation of Qaddafi stadium is all but complete as 100 percent grey structure work has been completed while finishing work is being undertaken at a rapid pace,” the report said, citing the PCB chairman.
Qaddafi Stadium is set to transform into a world-class facility, featuring over 34,000 seats, brand-new scoreboards on both sides and state-of-the-art floodlights, ensuring exceptional visibility for both players and spectators after sunset, according to the report.
Naqvi praised workers for keeping the project’s completion on track despite the challenging winter conditions and dense fog.
“We are committed to delivering a fully renovated and modernized Qaddafi Stadium before the ICC Champions Trophy,” he said. “It will stand as a symbol of excellence and pride for Pakistan cricket.”
The ICC Champions Trophy 2025 will take place from February 19 till March 9, with matches hosted across Pakistan and Dubai in a hybrid model.
The tournament’s structure follows a compromised decision after India refused to play in Pakistan, citing “security concerns.” Exercising its rights as the host nation, Pakistan designated Dubai as the neutral venue for India’s matches, ensuring all teams’ participation.
In Pakistan, Karachi, Lahore and Rawalpindi will host three group-stage games each. Lahore is also set to host the second semifinal. Dubai will host all three of India’s group matches and the first semifinal, should India qualify.
The tournament opener on Feb. 19 will feature Pakistan taking on New Zealand in Karachi, while India will face Bangladesh in Dubai on Feb. 20.
This will be the ninth edition of the ICC Champions Trophy, after an eight-year hiatus. The last tournament took place in England in 2017. The event will feature top eight teams in world cricket competing for one of the sport’s most prestigious titles.


Pakistan to abolish 150,000 government posts this year to implement rightsizing reforms

Updated 07 January 2025
Follow

Pakistan to abolish 150,000 government posts this year to implement rightsizing reforms

  • The development comes amid Pakistan’s efforts to revive its $350 billion economy since avoiding a default in 2023
  • The Pakistani government’s rightsizing process involves 43 ministries and 400 departments affiliated with them

ISLAMABAD: Pakistan’s Finance Minister Muhammad Aurangzeb on Tuesday said the federal government planned to abolish nearly 150,000 vacant government posts by June to implement its rightsizing reforms, which aim to reduce expenditures and enhance efficiency of public departments.
Pakistan’s federal government established an austerity committee in Feb. 2024 to cut its expenditures and implement institutional rightsizing reforms.
On Dec. 24, the committee proposed the closure and merger of various departments in the Ministries of Science and Technology, Commerce, Housing and Works, and National Food Security.
The committee also suggested the federal cabinet to reduce staff in these ministries by 30 percent, aiming to save the national exchequer around Rs42.1 billion ($151 million) annually.
“For the rightsizing of federal government, entire process, including recommendations and implementation for all 43 ministries and their 400 attached departments, will be completed before June 30,” Aurangzeb said at a press conference in Islamabad.
“Sixty percent of vacant regular posts, approximately 150,000, will be abolished or declared redundant, resulting in a significant financial impact.”
The development comes amid Pakistan’s efforts to revive its $350 billion economy since avoiding a default in June 2023. The South Asian country last year secured a new $7 billion loan from the International Monetary Fund (IMF) and has been actively pursuing trade and investment opportunities to put the economy on the path of recovery.
Sharing six-month performance of the austerity committee, he said general non-core services, including gardening, cleaning and plumbing, were outsourced by government departments to improve efficiency, while contingency posts were reduced to some extent.
“In the first phase, decisions were made concerning six ministries, including Kashmir Affairs and Gilgit-Baltistan, SAFRON (State and Frontier Regions), IT and Telecom, Industries and Production, National Health Services, and the Capital Administration and Development Division (CAD),” he said.
The committee decided to abolish CAD and merge the Ministries of Kashmir Affairs and Gilgit-Baltistan with SAFRON, according to the finance minister. This reduced 80 entities associated with these ministries to 40.
In the second phase, he said, the Ministries of Science and Technology, Commerce, Housing and Works, and National Food Security were reviewed.
“Out of the 60 entities within these ministries, 25 will be dissolved, 20 will be reduced, and nine will be merged,” Aurangzeb said, promising to ensure implementation of the austerity committee’s decisions.
“In the third phase, recommendations regarding five ministries, Federal Education and Professional Training, Information and Broadcasting, National Heritage and Culture, Finance Division, and Power Division, will be submitted to the federal cabinet for approval.”


Hundreds protest power outages in Pakistan’s north for fifth consecutive day

Updated 07 January 2025
Follow

Hundreds protest power outages in Pakistan’s north for fifth consecutive day

  • Routine load-shedding is widespread across fuel-deprived Pakistan, but residents of mountainous Gilgit-Baltistan region endure prolonged blackouts
  • Senior government official in the region says negotiations are ongoing with the protesters, who demand under-construction power projects be expedited

KHAPLU: Hundreds of people blocked a highway on Tuesday in Pakistan’s mountainous northern region in protest against power outages lasting longer than 20 hours, as temperatures plunged to minus 15 degrees Celsius.
Routine load-shedding is widespread across fuel-deprived Pakistan, but residents of the mountainous, snow-covered regions in Gilgit-Baltistan endure prolonged blackouts.
“We have been facing the worst kind of power cuts, we get only one or two hours of electricity during the whole day,” Baba Jan, a political activist who organized the protest, told AFP.
Around 1,000 people have joined the demonstration in the picturesque valley of Hunza since Friday, blocking a section of the 1,300-kilometer (808-mile) Karakoram Highway and preventing dozens of freight trucks from crossing into China.
People in the region usually rely on wood to keep warm as both gas and fuel-operated generators are too expensive.
“People from all walks of life including the tourists are suffering in extremely cold weather due to the absence of electricity,” Zahoor Ali, another protest organizer told AFP.
The highway is part of the China-Pakistan Economic Corridor (CPEC) in which China has invested billions of dollars, connecting the northern border to the southern coastal city of Gwadar.
“The Karakoram Highway at Ali Abad in Hunza is completely blocked for traffic... business between Pakistan and China is suspended for days owing to the blockade,” local trader Javaid Hussain told AFP.
“For the smooth running of business between Pakistan and China, the government should take steps to end the power crisis in the region.”
Pressure on the electricity grid increases during peak winter and summer seasons, leading to planned load-shedding as the government grapples with an energy supply crisis, exacerbated by political instability and economic stagnation.
Owing to its remoteness, Gilgit-Baltistan is not connected to the national grid and fails to generate enough power from dozens of hydro plants while thermal plants have proven costly.
Kamal Khan, a senior government official in the region, told AFP by phone that negotiations were ongoing with the protesters, who have demanded that under-construction power projects be expedited and thermal generator plants activated.
“Their demands are genuine and we agreed to fulfil all of their demands except the running of thermal generators... because they are very expensive,” he said.
Public protests against rising electricity prices and load-shedding have increased over the years in the country.
Meanwhile, prices have soared to more than double their 2021 rate as the government attempts to comply with demands from the International Monetary Fund to raise revenue.